Changes between Version 58 and Version 59 of StatusOfOpenvpn25


Ignore:
Timestamp:
07/22/20 10:31:21 (4 years ago)
Author:
Gert Döring
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • StatusOfOpenvpn25

    v58 v59  
    77As we missed our original deadline (Debian Buster freeze) we don't have a schedule yet, except "in year 2020". Nevertheless, the release will proceed as follows:
    88
    9 * 2.5_beta1 (early July)
     9* 2.5_beta1 (August 5)
    1010
    11   After this date, no new features allowed, stabilising starts for real.  Some minor "nice to have patches" might be accepted after evaluation/discussion on IRC; but should be avoided. Man page processing will be converted from the current groff formatting to a markdown formatting right before beta tagging.
     11  After this date, no new features allowed, stabilising starts for real.  Some minor "nice to have patches" might be accepted after evaluation/discussion on IRC; but should be avoided.
     12
     13  Git will be branched to release/2.5 at that point.
    1214
    1315* ??? - 2.5_beta2 (optional)
     
    2224* ??? - 2.5_rc2
    2325
    24   Branching out release/2.5 happens here.
     26  "If needed"
    2527
    26 * 2.5.0
     28* 2.5.0 (September 10)
     29
    2730  Final release.
    2831
    29 == Deadline: To be determined ==
    30 
    31 * Code freeze on June 30st, 2020 (based initially on discussions in Trento hackathon, postponed in IRC meeting on 4th March 2020, postponed again...)
    32 * 2.5.0 release on August 15th, 2020
    3332
    3433= Features/fixes to include =